A busy day today. Walter installed two more strong-motion instruments south and west of PaP. Justin and Steve embedded with two separate teams to assess the safety of buildings. Glenn and Marc assessed four "bridges", which turned out to be box culverts. On the way to the bridges, we saw numerous destroyed buildings. We also stopped by the National Palace and the Cathedral.
The first bridge, looking downstream.
The National Palace.
Temporary housing across from the palace.
The cathedral.
Friday, January 29, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment